Existing QAQC Report
QAQC PT Ang ang Fang Brother
Mine location in Lalampu, Morowali Regency with a production target of 100,000 tons per month. The role of PT BSA is to plan mining and management of QAQC. The mining activities are carried out by the owner. This project starts in September 2018.
QAQC PT GMS (Gerbang Multi Sejahtera)
The mine site in Laonti, South Konawe Regency with a production target of 200,000. This 200,000 target is done by two contractors with each contractor 100,000 tons per month. The role of PT BSA is to plan mining and QAQC management to get the production as planned. This project starts in August 2018.
QAQC PT BPN (Bakti Pertiwi Nusantara)
The mine site is in Fritu, Central Weda Regency, North Maluku, with a production target of 100,000. The role of PT BSA is to plan mining and QAQC management and coordinate mining contractor activities to obtain production as planned. This project starts in September 2018. BSA collaborates with PT. Getsami Indonesia as a mining contractor at this location.
QAQC PT MPR (Mulia Pacific Resources)
The location is in the Columnale, North Morowali Regency with a production target of 50,000 Mton per month. PT BSA collaborates with local partner PT. Tineba as a mining contractor. The role of PT BSA is to plan mining and management of QAQC. This project starts in February 2019.